Foundation 101

  Several methods exist for pre-stressing concrete, with post-tensioning being a very common one. Before a post-tension slab is poured, high-strength steel strands or cables, called tendons, are laid in a tight grid. These help support and give strength to the slab once it has cured. The tendons are sheathed in plastic so that they … Continue reading Foundation 101